UPDES SWPPP Compliance Evaluation Form – Sections 1 and 2

UPDES CONSTRUCTION GENERAL PERMIT (CGP) UTRC00000 and
COMMON PLAN PERMIT (CPP) UTRH00000
STORM WATER POLLUTION PREVENTION PLAN (SWPPP)
COMPLIANCE EVALUATION FORM(S)

Created November 2024.

Section 1: Instructions for SWPPP Evaluations
  1. The SWPPPs being reviewed with this document are being evaluated for compliance with the corresponding UPDES construction storm water discharge permit. For additional information on those permits, visit the Utah DWQ construction storm water permitting webpage: Utah DWQ construction storm water permitting webpage.
  2. The appropriate permit is identified by the applicant during permitting but must be confirmed by evaluation in Section 2 of this form to demonstrate applicability of coverage under either of the UPDES construction storm water permits:
  3. If the appropriate UPDES permit has been selected for coverage and the applicable complete SWPPP has been submitted for review with a complete application, then the SWPPP evaluation must move forward.
  4. Per Utah Code Title 19, Chapter 5, Section 108.3, the SWPPP reviewer shall complete the first review of the SWPPP within 14 business days after the day on which the applicant submits a complete SWPPP and application for local storm water permit coverage, if local permit coverage is required.
  5. A “No” answer for any questions in the following SWPPP evaluations, for either CGP in Section 3 or CPP in Section 4, will amount to an incomplete SWPPP and will be returned for modification. Questions answered “N/A” do not affect approval unless the reviewer determines that answer was incorrect for a given question.
  6. Per Utah Code Title 19, Chapter 5, Section 108.3, any non-compliance in the SWPPP that requires modification to bring the SWPPP into compliance requires a specific request for modification to be provided to the applicant. Such requests must be thorough enough to bring the SWPPP into compliance upon correction and must include citations to local ordinances or state or federal law requiring the modification. Requested modifications must also be logged in an index of requested modifications.
  7. Per Utah Code Title 19, Chapter 5, Section 108.3, the SWPPP reviewer has 14 business days after the day on which the operator submits the modified SWPPP to complete the review.

Note: Pre-Construction SWPPP Review Checklists are a requirement of all UPDES MS4 Permits (Part 4.2.4.3). Using these SWPPP evaluation forms will meet that requirement.

Reviewer Signature Block

Privacy Notice

The personal data being collected is included in a public record as defined under Utah Code 63G-2-301 and may be available to the public as provided in Utah Code 63G-2-201. Prior to making a record available to the public, the City of West Jordan redacts private, protected, or controlled information as defined in Utah Code 63G-2-302, 304, and 305. For more information, contact the City’s Data Privacy Officer, Tangee Sloan – tangee.sloan@westjordan.utah.gov.